These tests are intended to detect any manufacturing transport and.
Medium voltage cable installation standards.
Insulated bundled overhead conductors torsade 12 20 24 kv xlpe technical information formulae.
What is the permissible leakage current value for a 11kv cable if there any formula for calculating leakage current cable rated voltage 8 7 to 15 kv 2070 meter length ac hi pot test kit applied volt.
For armoured cables pulling tension kg 5kg total cross section of conductors for unarmoured cables.
Standardisedcable installation depth to minimum cover of750 mm and maximum depth of 1500mm section 14 9 added section 14 10 clarified marker tape and protective cover requirements section 14 11 clarified cable sealing exposed cables and terminated cables requirements section 14 13 14 14 and 14 15.
Field diagnostic tests can be performed on cable systems during various stages of their operating life.
The text and pictures below highlight the more important aspects of the installation of cable accessories from the point of view of their effect on system reliability.
Types of cable tests.
Single and three core medium voltage cables according to international standard iec 60502 1 8 3 3 6 kv cables xlpe insulated pvc or pe sheathed xlpe insulated screened pvc or pe sheathed cables for voltages up to and including 36 kv.
High voltage withstand testing 39 time leakage test 41.
Cables shall be laid directly on ground on 10 cm minimum soft sand and ground will be back filled properly avoiding any aggregate with sharp edges for damaging the cable.
Medium voltage underground cables 4 cable l cable power circuit design 7 n conductor 7 8 n conductor screen 8 n insulation 8 n insulation screen 8 9 n metallic screen 9 10 n outer protective sheath 10 11 l table of cable eleents 1 l cable constructions 1 l cable drus 1 l cable tests following production 1 accessories l introduction 1 l connectors and lugs 1.
Correct size and type.
Conducted after the cable is installed but before any accessories joints splices and terminations are installed.
Cable pulling tension during installation the cable pulling tension during installation can be estimated by the following formula.
Medium voltage power cables 20 low voltage power cables 20 low voltage control cables 20 3.
Cables should not be installed at ambient temperatures.
As defined by the ieee 400 standard cable tests are defined as.
Added section on live end.
The writers of this document hope that it will be found both useful and interesting and that it will contribute to the increasing reliability of medium voltage networks.